# Dry-Docking Work Completed on Ro-Pax Île Rouge

> Customer: Marine Atlantic Category: Maintenance and painting Date: 2026 Project contractor: Anastasios Ventouris Dry-Docking Work Completed on Ro-Pax Île…

URL: https://a-ventouris.com/projects/dry-docking-work-completed-on-ro-pax-ile-rouge/
Last updated: 2026-09-27

---

![Ile Rouge 3](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-3.jpg)

##### Customer:

###### Marine Atlantic

##### Category:

###### Maintenance and painting

##### Date:

###### 2026

##### Project contractor:

###### Anastasios Ventouris

## Dry-Docking Work Completed on Ro-Pax Île Rouge

Anastasios Ventouris – Maritime and Industrial Applications completed maintenance and painting work on the passenger vessel Andros King. The project included the complete removal of old paint layers from the vessel’s exterior surfaces and hull, as well as from the interior of the garage deck. The exterior surfaces and garage deck were then repainted. A silicone coating was applied to the hull, creating a smooth surface that helps reduce drag while the vessel is underway. Depending on operating conditions, the coating may help lower fuel consumption and improve speed performance.

#### Photo Gallery

![Ile Rouge 1](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-1.jpg)

![Ile Rouge 2](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-2.jpg)

![Ile Rouge 3](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-3.jpg)

![Ile Rouge 4](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-4.jpg)

![Ile Rouge 5](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-5.jpg)

![Ile Rouge 8](https://a-ventouris.com/wp-content/uploads/2026/09/Ile-Rouge-8.jpg)
